Application of Assignment Model in Optimizing Cost of a Building Project
The study sought to minimize the total cost of building a three bed-room Detached House in Minna. An Assign ment problem was formulated and using Hungarian solu tion method, a realistic result was obtained. The sighting study with unpopular scenario in building recommended the sum of N3,885,000 which can be used to build a house of the type and specifications as provided in the study.