Application of Assignment Model in Optimizing Cost of a Building Project
1 Department of Mathematics, Federal University of Technology Minna
2 Department of Architecture, Federal University of Technology Minna.
3 Department of Project Management, Federal University of Technology Minna.
* Corresponding author: ngutornyor@yahoo.com
2 Department of Architecture, Federal University of Technology Minna.
3 Department of Project Management, Federal University of Technology Minna.
* Corresponding author: ngutornyor@yahoo.com
Abstract
The study sought to minimize the total cost of building
a three bed-room Detached House in Minna. An Assign
ment problem was formulated and using Hungarian solu
tion method, a realistic result was obtained. The sighting
study with unpopular scenario in building recommended
the sum of N3,885,000 which can be used to build a house
of the type and specifications as provided in the study.
Keywords
Minimization
Assignment Model and Optimization Cost.
How to Cite
Ngutor, N., Toyin, O., & Kevin, L. (2015). Application of Assignment Model in Optimizing Cost of a Building Project. Nigerian Journal of Mathematics and Applications, 24(1), 01−12.
N. Ngutor, O. Toyin, and L. Kevin, "Application of Assignment Model in Optimizing Cost of a Building Project," Nigerian Journal of Mathematics and Applications, vol. 24, no. 1, pp. 01−12, December 2015.