OT

Olaniyan Toyin

Department of Architecture, Federal University of Technology Minna.

1 Publication
1 Views
0 Downloads

Publications 1

1
Research Article Vol. 24, Issue 1

Application of Assignment Model in Optimizing Cost of a Building Project

Nyor Ngutor*, Olaniyan Toyin, Ladi Kevin

The study sought to minimize the total cost of building a three bed-room Detached House in Minna. An Assign ment problem was formulated and using Hungarian solu tion method, a realistic result was obtained. The sighting study with unpopular scenario in building recommended the sum of N3,885,000 which can be used to build a house of the type and spe...

Back to Articles